# Run due diligence

How to work this file: do each step marked "agent" yourself, unless the step says to ask first. At each step marked "person", stop, tell me what the person must do, and wait until I say it is done.
Keep my firm's files on my machine. Do not upload them anywhere.

## What it is

Confirm the property is what was underwritten before the deposit goes hard: title and survey, environmental, physical condition, zoning, flood, leases and contracts. Agents read, compare and calendar; licensed professionals inspect, and a principal makes the go or no-go call in time.

## Status

- Review: Practitioner-reviewed on 2026-11-12
- Sources checked: 2026-11-12
- Coverage: Federal + Texas
- This file: the syndication structure, industrial property. 13 steps; an agent can do 7 of them.

## Steps

### Step 01. Calendar the contract's diligence deadlines

Who: agent. Do this step.

Read the signed contract and list every date it sets: seller deliveries, the title and survey objection periods, the feasibility period, when the deposit goes hard, extension options and closing. Enter them in the deadline calendar, counting from the effective date exactly as the contract defines days and notice. Add the Phase I's own limits: all appropriate inquiries must fall within one year before acquisition, and the interviews, cleanup-lien search, records review, site visit and the professional's declaration within 180 days. A Texas-form title commitment ends 90 days after its effective date unless the policy issues sooner.

- Waits on: nothing; it can start first
- Rules:
  - All appropriate inquiries: what the Phase I must cover and how long it lasts (40 CFR 312.1, 312.11, 312.20, 312.21 and 312.22)
- Sources:
  - [40 CFR Part 312, Innocent Landowners, Standards for Conducting All Appropriate Inquiries](https://www.ecfr.gov/current/title-40/chapter-I/subchapter-J/part-312)
  - [Form T-7, Commitment for Title Insurance (effective January 3, 2014)](https://www.tdi.texas.gov/title/documents/form_t-07.pdf)

### Step 02. Order title, survey, environmental and condition reports

Who: person online, principal. Stop here: tell me what the person must do, and wait.
Gates: signature.

On day one, order the title commitment from the title company the contract names and engage the surveyor, the environmental professional and the property condition consultant. Ask for a 2026 ALTA/NSPS Land Title Survey, name the Table A items wanted, and list who it is certified to, adding the lender once known. The Phase I must be done by, or under the supervision of, an environmental professional as 40 CFR 312.10 defines one; ASTM E1527-21 is the recognized practice. Ask for the condition report to ASTM E2018-24. If a lender is lined up, ask which firms and scopes it accepts so the reports are not redone.

- Waits on: step 01
- Rules:
  - ALTA/NSPS land title surveys: the 2026 standards apply (Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys (2026), American Land Title Association and National Society of Professional Surveyors)
  - All appropriate inquiries: what the Phase I must cover and how long it lasts (40 CFR 312.1, 312.11, 312.20, 312.21 and 312.22)
- Sources:
  - [ALTA/NSPS Land Title Survey Standards](https://www.alta.org/topics/topic-land-survey-standards)
  - [2026 ALTA/NSPS Standards](https://nsps.us.com/page/2026ALTA)
  - [40 CFR Part 312, Innocent Landowners, Standards for Conducting All Appropriate Inquiries](https://www.ecfr.gov/current/title-40/chapter-I/subchapter-J/part-312)
  - [ASTM E2018-24, Standard Guide for Property Condition Assessments: Baseline Property Condition Assessment Process](https://store.astm.org/e2018-24.html)

### Step 03. Do the buyer's own all-appropriate-inquiries tasks

Who: agent. Do this step.

The rule puts some inquiries on the buyer, not the consultant. Search for environmental cleanup liens recorded against the property, or confirm someone is running that search. Write down what the buyer's people know about the site, its past uses and its neighbors. Record whether the price reasonably reflects what the property would be worth uncontaminated and, if not, whether contamination explains the gap. Send all of it to the environmental professional before the site visit; the inquiry is not complete until it takes the buyer's knowledge into account.

- Waits on: step 02
- Rules:
  - All appropriate inquiries: what the Phase I must cover and how long it lasts (40 CFR 312.1, 312.11, 312.20, 312.21 and 312.22)
- Sources:
  - [40 CFR Part 312, Innocent Landowners, Standards for Conducting All Appropriate Inquiries](https://www.ecfr.gov/current/title-40/chapter-I/subchapter-J/part-312)
  - [Brownfields All Appropriate Inquiries](https://www.epa.gov/brownfields/brownfields-all-appropriate-inquiries)

### Step 04. Get the Phase I environmental site assessment

Who: person offline, consultant. Stop here: tell me what the person must do, and wait.

The environmental professional interviews owners and occupants, reviews historical sources and government records for the site and nearby properties, and inspects the site and adjoining land. A voluntary seller's refusal of access does not excuse the site visit, so use the contract's access clause early. The signed report must give an opinion on whether conditions indicating releases were found, list data gaps and their significance, carry the professional's declaration, and include any opinion on further investigation. If it reports a recognized environmental condition, follow the situation for that finding.

- Proof to keep: Phase I environmental site assessment
- Waits on: step 03
- Rules:
  - All appropriate inquiries: what the Phase I must cover and how long it lasts (40 CFR 312.1, 312.11, 312.20, 312.21 and 312.22)
- Sources:
  - [40 CFR Part 312, Innocent Landowners, Standards for Conducting All Appropriate Inquiries](https://www.ecfr.gov/current/title-40/chapter-I/subchapter-J/part-312)
  - [Brownfields All Appropriate Inquiries](https://www.epa.gov/brownfields/brownfields-all-appropriate-inquiries)

### Step 05. Get the property condition assessment

Who: person offline, consultant. Stop here: tell me what the person must do, and wait.

The consultant walks through the property, reviews its documents, interviews the people who run it, and reports material physical deficiencies with opinions of the cost to remedy them. ASTM E2018-24 is the current baseline guide; it is a paid standard, so ask the consultant in writing what its scope covers and excludes. Give the consultant the warranties, permits, service records and recent capital work the seller delivered. Send the immediate and near-term costs to the underwriting.

For industrial property: Have the scope cover the roof, slab, dock doors and levelers, fire sprinklers and any cranes or heavy power the tenant relies on; the lease's repair clauses decide who pays.

- Proof to keep: Property condition assessment
- Waits on: step 02
- Sources:
  - [ASTM E2018-24, Standard Guide for Property Condition Assessments: Baseline Property Condition Assessment Process](https://store.astm.org/e2018-24.html)

### Step 06. Survey the property to the 2026 ALTA/NSPS standards

Who: person offline, consultant. Stop here: tell me what the person must do, and wait.

Send the surveyor the title commitment and copies of every recorded exception as soon as they arrive. An ALTA/NSPS survey is a boundary survey; it shows boundary issues, easements, encroachments and access that affect insurable title. Under the 2026 standards the surveyor notes evidence of possession along the whole perimeter and records what owners or occupants say about the boundary. In Texas, the owner's policy can amend the area-and-boundary exception only on a survey the title company accepts, so send the draft to the title examiner before it is final.

- Proof to keep: Survey
- Waits on: step 02
- Rules:
  - ALTA/NSPS land title surveys: the 2026 standards apply (Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys (2026), American Land Title Association and National Society of Professional Surveyors)
  - Texas title insurance: promulgated rates and forms (Tex. Ins. Code 2703.002, 2703.151 and 2703.208)
- Sources:
  - [2026 ALTA/NSPS Standards](https://nsps.us.com/page/2026ALTA)
  - [ALTA/NSPS Land Title Survey Standards](https://www.alta.org/topics/topic-land-survey-standards)
  - [Form T-7, Commitment for Title Insurance (effective January 3, 2014)](https://www.tdi.texas.gov/title/documents/form_t-07.pdf)
  - [Basic Manual Section IV, Procedural Rule P-2: Amendment of Exception to Area and Boundaries](https://www.tdi.texas.gov/title/titlem4a.html)

### Step 07. Review the commitment and survey and list objections

Who: agent. Do this step.

Check Schedule A against the contract: proposed insured, policy amount, the interest insured, the vested owner and a legal description that matches the survey. Pull every recorded document behind Schedule B and note what each does to use, access and value. Read Schedule C: requirements that become exceptions unless cleared, such as payoffs, releases, proof that recent work is paid, and the buyer's own entity documents. Match the survey's easements and encroachments to Schedule B. Draft the objection list with the cure asked for each item. An unexpected lien has its own situation.

- Waits on: step 06
- Rules:
  - Texas title insurance: promulgated rates and forms (Tex. Ins. Code 2703.002, 2703.151 and 2703.208)
- Sources:
  - [Form T-7, Commitment for Title Insurance (effective January 3, 2014)](https://www.tdi.texas.gov/title/documents/form_t-07.pdf)

### Step 08. Send title and survey objections before the deadline

Who: person online, counsel. Stop here: tell me what the person must do, and wait.
Gates: signature, hard to undo.

Counsel turns the objection list into the notice the contract requires and delivers it by the contract's notice method before the objection deadline, copying the title company with a request for what it needs to delete or amend each item. Calendar the seller's response period and the contract's outcome if the seller does not cure, usually a choice to waive, extend or terminate. A late objection may count as a waiver under the contract.

- Waits on: step 07
- Sources: common practice, with no public source to cite

### Step 09. Confirm zoning, permitted use and code status

Who: agent in a browser. Do this step.

Run confirm-zoning-and-use for the parcel's zoning, permitted uses, approvals, certificates of occupancy, code cases, recorded restrictions and rebuild limits. Bring its zoning report and counsel's gap-by-gap answers from counsel-reviews-gaps to update-underwriting. Order any zoning verification letter or vendor report through order-third-party-reports, which tracks its delivery.

- Proof to keep: Zoning report
- Waits on: step 01
- Sources: common practice, with no public source to cite

### Step 10. Check the flood zone and mapped wetlands

Who: agent in a browser. Do this step.

Search the address on FEMA's Flood Map Service Center, the official public source for National Flood Insurance Program flood hazard data, and save the current panel, zone and effective date; maps change. If a building is in a special flood hazard area where federal flood insurance is available, a regulated lender may not make the loan unless the building is insured against flood for the loan's term, so tell the lender and insurance broker now. Then view the site on the Fish and Wildlife Service's Wetlands Mapper. Its maps do not set regulatory boundaries; a mapped wetland on land to be built on goes to an expert and the Army Corps of Engineers.

- Waits on: step 01
- Rules:
  - Flood insurance is required on federally regulated loans in special flood hazard areas (42 U.S.C. 4012a(b))
- Sources:
  - [FEMA Flood Map Service Center](https://msc.fema.gov/portal/home)
  - [42 U.S.C. 4012a, Flood insurance purchase and compliance requirements and escrow accounts](https://www.law.cornell.edu/uscode/text/42/4012a)
  - [Wetlands Mapper](https://www.fws.gov/program/national-wetlands-inventory/wetlands-mapper)

### Step 11. Review leases, estoppels and service contracts

Who: agent. Do this step.

Abstract every lease and amendment and tie the rent roll to it: rent, term, options, recoveries, deposits, defaults and any right to buy the property. Check each returned estoppel against its lease and the rent roll and list every difference. In Texas, the buyer becomes liable for tenants' security deposits from the day it takes title, so confirm the amounts now. Note which leases are subordinate to a mortgage and which SNDAs exist. List service contracts with their termination notice periods, mark which to keep, and check what the contract says the seller must terminate.

For industrial property: With a single tenant, its lease and estoppel carry the deal; read its renewal, expansion, purchase and termination rights closely.

- Proof to keep: Lease abstract
- Waits on: step 01
- Sources:
  - [Texas Property Code, Chapter 93 (Section 93.007, Cessation of owner's interest)](https://statutes.capitol.texas.gov/Docs/PR/htm/PR.93.htm)
  - [Texas Property Code, Chapter 92 (Section 92.105, Cessation of owner's interest)](https://statutes.capitol.texas.gov/Docs/PR/htm/PR.92.htm)

### Step 12. Re-run the underwriting with what diligence found

Who: agent. Do this step.

Put the findings into the model: repair and replacement costs from the condition report, rents and recoveries as the leases and estoppels actually read, current tax and insurance quotes, and the cost of curing any title, survey, zoning or environmental issue. Re-run returns and debt sizing and compare them with the approved underwriting. Write a short memo listing each finding, its cost and the ask: a price credit, a seller repair, an extension or no change.

- Proof to keep: Underwriting model, Investment committee memo
- Waits on: steps 04, 05, 08, 09, 10, 11
- Sources: common practice, with no public source to cite

Not in this view: for the JV structure, the step "Get the JV partner's approval before the deposit goes hard" (person online, investor) comes after this step.

### Step 13. Decide go or no-go before the deposit goes hard

Who: person online, principal. Stop here: tell me what the person must do, and wait.
Gates: signature, irreversible.

A principal decides with the memo in hand, before the feasibility deadline. Go: let the period run or send any approval notice the contract requires, and confirm the deposit's status with the escrow agent. Renegotiate: counsel puts any price or term change, or an extension, in an amendment both sides sign before the deadline. No-go: counsel delivers the termination notice by the contract's method before the deadline and asks the escrow agent to return the deposit. Never rely on a verbal extension.

- Waits on: step 12
- Sources: common practice, with no public source to cite

## Rule cards

### All appropriate inquiries: what the Phase I must cover and how long it lasts

Rule `us-fed.epa.all-appropriate-inquiries` · Federal

To claim CERCLA's innocent landowner, contiguous owner or bona fide prospective purchaser protection, a buyer conducts all appropriate inquiries before taking title: an environmental professional's inquiry plus the buyer's own cleanup-lien search, specialized knowledge and check of price against uncontaminated value. ASTM E1527-21, or E2247-23 for forestland or rural property, is a recognized way to comply. The inquiry must fall within one year before acquisition, and the interviews, lien search, records review, site visit and declaration within 180 days.

- Law: [40 CFR 312.1, 312.11, 312.20, 312.21 and 312.22](https://www.ecfr.gov/current/title-40/chapter-I/subchapter-J/part-312)
- As of 2026-11-09; sources checked 2026-11-12; AI-drafted
- Watch for: EPA amendments to Part 312 or to the ASTM standards it recognizes; E1527-13 stopped qualifying on February 13, 2024 and E2247-16 on June 24, 2025.
- Sources:
  - [40 CFR Part 312, Innocent Landowners, Standards for Conducting All Appropriate Inquiries](https://www.ecfr.gov/current/title-40/chapter-I/subchapter-J/part-312). Office of the Federal Register (eCFR), opened 2026-11-12, primary source.
  - [Brownfields All Appropriate Inquiries](https://www.epa.gov/brownfields/brownfields-all-appropriate-inquiries). U.S. Environmental Protection Agency, opened 2026-11-12, primary source.

### ALTA/NSPS land title surveys: the 2026 standards apply

Rule `us-fed.alta-nsps.survey-standards` · Federal

The 2026 Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys, an industry standard adopted jointly by ALTA and NSPS rather than a statute, took effect February 23, 2026 and replaced the 2021 edition. A survey contracted on or after that date follows the 2026 standards, with very limited exceptions. The request names a 2026 ALTA/NSPS Land Title Survey and the optional Table A items wanted. Where a state's minimum standards are stricter, the surveyor meets those too.

- Law: [Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys (2026), American Land Title Association and National Society of Professional Surveyors](https://www.alta.org/topics/topic-land-survey-standards)
- As of 2026-11-12; sources checked 2026-11-12; AI-drafted
- Watch for: The next joint ALTA/NSPS revision; the standards are revised about every five years.
- Sources:
  - [ALTA/NSPS Land Title Survey Standards](https://www.alta.org/topics/topic-land-survey-standards). American Land Title Association, opened 2026-11-12, primary source.
  - [2026 ALTA/NSPS Standards](https://nsps.us.com/page/2026ALTA). National Society of Professional Surveyors, opened 2026-11-12, primary source.

### Flood insurance is required on federally regulated loans in special flood hazard areas

Rule `us-fed.flood.mandatory-purchase` · Federal

A federally regulated or federal agency lender may not make, increase, extend or renew a loan secured by improved real estate in a special flood hazard area where federal flood insurance is available unless the building and any personal property securing it carry flood insurance for the loan's term of at least the lesser of the principal balance and the program's maximum for that property type. Loans Fannie Mae or Freddie Mac buy must comply. Qualifying private policies count.

- Law: [42 U.S.C. 4012a(b)](https://www.law.cornell.edu/uscode/text/42/4012a)
- As of 2026-11-12; sources checked 2026-11-12; AI-drafted
- Watch for: Amendments to 42 U.S.C. 4012a or to National Flood Insurance Program coverage limits, and FEMA map revisions that move a property into or out of a special flood hazard area.
- Sources:
  - [42 U.S.C. 4012a, Flood insurance purchase and compliance requirements and escrow accounts](https://www.law.cornell.edu/uscode/text/42/4012a). Legal Information Institute (statute text), opened 2026-11-12, primary source.
  - [Flood Zones (glossary)](https://www.fema.gov/about/glossary/flood-zones). Federal Emergency Management Agency, opened 2026-11-12, primary source.
  - [FEMA Flood Map Service Center](https://msc.fema.gov/portal/home). Federal Emergency Management Agency, opened 2026-11-12, primary source.
  - [Types of Coverage (National Flood Insurance Program limits)](https://agents.floodsmart.gov/topics/selling-flood-insurance/coverage). FEMA National Flood Insurance Program (FloodSmart for agents), opened 2026-11-12, primary source.

### Texas title insurance: promulgated rates and forms

Rule `us-tx.title.promulgated-rates-forms` · Texas

Texas's commissioner of insurance fixes and promulgates title insurance premium rates, and no premium may be charged at a different rate, except for reinsurance between title companies. A title company or agent may use a form the law requires to be prescribed or approved only after the commissioner does so. Rates, forms and procedural rules are published in TDI's Basic Manual; the basic premium chart in effect since March 1, 2026 sets the premium by policy amount.

- Law: [Tex. Ins. Code 2703.002, 2703.151 and 2703.208](https://statutes.capitol.texas.gov/Docs/IN/htm/IN.2703.htm)
- As of 2026-11-12; sources checked 2026-11-14; AI-drafted
- Watch for: A new rate order or form adoption by the commissioner; basic premium rates changed March 1, 2026.
- Sources:
  - [Texas Insurance Code, Chapter 2703 (Policy forms and premium rates)](https://tcss.legis.texas.gov/resources/IN/htm/IN.2703.htm). Texas Legislature, opened 2026-11-14, primary source.
  - [Title Insurance Basic Manual](https://www.tdi.texas.gov/title/titleman.html). Texas Department of Insurance, opened 2026-11-14, primary source.
  - [Texas Title Insurance Basic Premium Rates (rates effective March 1, 2026)](https://www.tdi.texas.gov/title/titlerates2026.html). Texas Department of Insurance, opened 2026-11-14, primary source.

## Sources

1. [40 CFR Part 312, Innocent Landowners, Standards for Conducting All Appropriate Inquiries](https://www.ecfr.gov/current/title-40/chapter-I/subchapter-J/part-312). Office of the Federal Register (eCFR), opened 2026-11-12, primary source.
2. [Brownfields All Appropriate Inquiries](https://www.epa.gov/brownfields/brownfields-all-appropriate-inquiries). U.S. Environmental Protection Agency, opened 2026-11-12, primary source.
3. [Form T-7, Commitment for Title Insurance (effective January 3, 2014)](https://www.tdi.texas.gov/title/documents/form_t-07.pdf). Texas Department of Insurance, opened 2026-11-12, primary source.
4. [Basic Manual Section IV, Procedural Rule P-2: Amendment of Exception to Area and Boundaries](https://www.tdi.texas.gov/title/titlem4a.html). Texas Department of Insurance, opened 2026-11-12, primary source.
5. [ALTA/NSPS Land Title Survey Standards](https://www.alta.org/topics/topic-land-survey-standards). American Land Title Association, opened 2026-11-12, primary source.
6. [2026 ALTA/NSPS Standards](https://nsps.us.com/page/2026ALTA). National Society of Professional Surveyors, opened 2026-11-12, primary source.
7. [ASTM E2018-24, Standard Guide for Property Condition Assessments: Baseline Property Condition Assessment Process](https://store.astm.org/e2018-24.html). ASTM International, opened 2026-11-12, primary source.
8. [FEMA Flood Map Service Center](https://msc.fema.gov/portal/home). Federal Emergency Management Agency, opened 2026-11-12, primary source.
9. [42 U.S.C. 4012a, Flood insurance purchase and compliance requirements and escrow accounts](https://www.law.cornell.edu/uscode/text/42/4012a). Legal Information Institute (statute text), opened 2026-11-12, primary source.
10. [Wetlands Mapper](https://www.fws.gov/program/national-wetlands-inventory/wetlands-mapper). U.S. Fish and Wildlife Service, opened 2026-11-12, primary source.
11. [Texas Property Code, Chapter 93 (Section 93.007, Cessation of owner's interest)](https://statutes.capitol.texas.gov/Docs/PR/htm/PR.93.htm). Texas Legislature, opened 2026-11-12, primary source.
12. [Texas Property Code, Chapter 92 (Section 92.105, Cessation of owner's interest)](https://statutes.capitol.texas.gov/Docs/PR/htm/PR.92.htm). Texas Legislature, opened 2026-11-12, primary source.

---

From https://www.promptedcre.com/playbooks/run-due-diligence, computed 2026-11-23. Not legal advice: every step says where it comes from, a cited source or common practice.
