Fire, storm or flood damages the property

Make the site safe, notify the insurer and lender, document the loss and communicate with tenants and investors.

When this happensAct within hours

A fire, storm or flood damages the building or makes space unusable.

7 of 13steps an agent can do7 of 14steps an agent can do

Paste into your agent: Read promptedcre.com/install and run the "Fire, storm or flood damages the property" scenario with me.

Download the file: this playbook as a Markdown file
Your structure
Your property type
Review
AI-drafted
Sources checked
Coverage
Federal + Texas

Steps

  • Agent
  • Agent in a browser
  • Person online
  • Person offline
  • A person’s step has a cut corner
  1. Step 1:Get everyone out safely and call emergency services

    Person offline· principalHigh risk
    Details of step 1, common practice

    Get every occupant, worker and visitor clear of the damage, and call emergency services for fire, injury, structural danger, a gas leak or downed lines. Keep everyone out until the fire department or the building official allows entry, and have the utilities shut off gas, power or water where the damage calls for it. Write down who was hurt, what happened and when, and who responded; report any injury to the liability insurer through the broker, and confirm the employer has made any report the law requires. If fuel, chemicals or other hazardous material escaped, also follow environmental-release-on-site. Then tell the principals, the property manager, the broker and, in a joint venture, the capital partner as the JV agreement requires, and name one person to speak for the firm.

    Multifamily

    Account for the residents of every unit, keep a list of who cannot return and how to reach them, and tell residents where updates will be posted.

    Why a person does it

    Clearing a building and calling responders happens on site and by phone; an agent can only keep the contact list.
    Risk
    High
    Undo
    Reversible
    Approval
    None
    Waits on
    Nothing; starts first

    Source

    Common practice, with no public source to cite.

  2. Step 2:Stop further damage under signed contracts with licensed firms

    Person online· principalSignatureHard to undoHigh risk
    Details of step 2, 9 sources

    Before any contractor likely to be paid from a claim starts, a principal signs its written contract (scope, rates, a not-to-exceed amount); pay against invoices and lien waivers. The contractors then stop the water, tarp, board up and make temporary repairs only, drying out at once because the federal flood policy excludes mold damage from failing to maintain the property after a flood recedes. In Texas a contract of $1,000 or more paid from a claim must print the statutory deductible notice, and the contractor may not waive or rebate it without the insurer's consent. Mold remediation of 25 contiguous square feet or more needs a licensed remediator, not the project's assessor. Before tear-out or demolition, have the area inspected for asbestos as run-a-capital-project describes, with Texas-licensed firms surveying and abating in a commercial or five-plus-unit building; any federal notice is due by the next working day for emergency work.

    Industrial

    Texas asbestos licensing does not reach an industrial facility whose access is limited principally to employees because of a hazardous process, or a manufacturing facility open only to workers and invited guests under controlled conditions; the federal asbestos rule still applies.

    Multifamily

    In Texas an owner of residential property with fewer than 10 units, or its manager or employee, may do mold work there without a mold license unless that manager or employee does mold work for the public. Neither the federal asbestos rule nor Texas asbestos licensing reaches an apartment building of four or fewer units.

    Why a person does it

    Signing contracts and directing emergency work on site bind the firm; an agent can check licenses and compare scopes.
    Signs
    Stop further damage under signed contracts with licensed firms
    Drawn by
    Principal
    Approved by
    Principal signs. Not signed yet.
    Risk
    High
    Undo
    Hard to undo
    Approval
    Signature
    Waits on
    Step 01
    Uses
    Property insurance binder
  3. Step 3:Photograph and list the damage before cleanup

    Person offline· principalHigh risk
    Details of step 3, 2 sources

    Before cleanup or tear-out, photograph and video every affected area with the date, entering tenant space as the leases allow in an emergency: each side of the exterior, the roofs, each damaged room or suite, the waterline or burn pattern, equipment nameplates and damaged contents, and undamaged areas for comparison. If hurricane-forecast opened this playbook, compare against its pre-storm shot list and photos. Keep damaged property apart and in order, with samples, for the insurers to examine; tell each insurer before wet material is torn out, and hold permanent repairs and disposal until a claims examiner is consulted. The agent builds the loss inventory from the files, condition assessment and asset records: each item's quantity, description, actual cash value and amount of loss, with bills and receipts, as the federal flood policy requires. Record which spaces are unusable and since when; rent abatement and rent loss cover turn on it.

    Why a person does it

    Photographing the damage is done on site by a person; building the inventory from the photos is agent work.
    Risk
    High
    Undo
    Reversible
    Approval
    None
    Waits on
    Step 01
    Uses
    Rent roll, Property condition assessment
  4. Step 4:Report the loss in writing to each insurer and to the lender

    AgentIrreversibleHigh risk
    Details of step 4, 4 sources

    Once a person approves, send the lender and each insurer that may cover the loss written notice as soon as people are safe. List each such policy (property, flood, windstorm, rent loss, liability) with its reporting method, deadline and deductible; in a fund, note any shared blanket limit or deductible. Each notice, copied to the broker, gives policy number, date, cause, damage, unusable spaces and a contact. Federal flood policies require prompt written notice; a Texas Windstorm Insurance Association (TWIA) claim is due within one year of the damage (the commissioner may add up to 180 days for good cause); a Texas prompt-payment insurer must acknowledge and request what it needs within 15 days, or 30 business days if surplus lines. Draft the lender's notice from the loan's casualty clause. If hurricane-forecast opened this playbook, start the list from its coverage and contact sheets and attach its damage summary.

    Multifamily

    A residential building of four or fewer units is insured on the federal flood Dwelling Form, not the General Property Form this record cites; read that form's own claim terms.

    Why an agent can do it

    The policy terms are in the insurance file and the notices are drafting; each goes out only after a person approves it.
    Risk
    High
    Undo
    Irreversible
    Approval
    Approved each run
    Waits on
    Step 01
    Uses
    Property insurance binder, Loan documents
  5. Step 5:Read each lease's and the loan's casualty and restoration terms

    AgentHigh risk
    Details of step 5, 3 sources

    From the lease abstracts, and the leases where an abstract is silent, list for each tenant when and how much rent abates, who restores what, the landlord's deadlines to estimate and finish restoration, each side's termination rights and notice periods, and how deductibles pass through. From the loan documents, list who adjusts and settles the claim and above what amount the lender joins, where proceeds go, what releases them to restore (plans, budget, a balancing deposit), when the lender may apply them to the debt, and any restoration deadline; a federal flood policy pays building losses to the insured and each mortgagee as interests appear. In a joint venture, list the JV agreement's terms on casualty notice, emergency spending outside the budget, and control of the claim and restoration. Texas Property Code chapter 93 has no casualty section, so the commercial lease governs; residential leases also follow section 92.054.

    Industrial

    In a single-tenant net lease the tenant may insure and restore the building; read who controls the claim and the proceeds, and whether rent continues while the tenant restores.

    Multifamily

    In Texas, if a casualty not caused by the negligence or fault of the resident, the resident's family, guests or invitees leaves a unit as a practical matter totally unusable, either side may end the lease by written notice before repairs are finished, and the resident gets a pro rata rent refund from move-out and any deposit owed. Partial unusability reduces rent only by court judgment unless the written lease says otherwise, and for an insured casualty the repair period runs from the landlord's receipt of the insurance proceeds.

    Office

    Read how abatement is measured when only some floors or suites are out of use, and whether lost access or building services counts.

    Retail

    Read whether damage to an anchor's or major tenant's space triggers co-tenancy rent or termination rights in other leases, and any restoration duty in a reciprocal easement agreement.

    Why an agent can do it

    The terms are in the signed leases, abstracts and loan documents; reading and listing them is document work.
    Risk
    High
    Undo
    Reversible
    Approval
    None
    Waits on
    Nothing; starts first
    Uses
    Lease abstract, Lease, Loan documents, Joint venture agreement
  6. Step 6:Tell tenants and investors what happened and what the documents provide

    AgentIrreversibleHigh risk
    Details of step 6, 1 source

    Draft the notices the leases require, sent as each lease's notice clause sets: the casualty, spaces out of use, rent abatement as the lease provides, the restoration estimate when due, and how to reach the firm. Update the rent roll for abatements and hand billing changes to collect-rent-and-reconcile-cam before the next bill. Once retest-cash-and-loan has run, draft the investor update: what happened, that people are safe, coverage and deductibles, the claim's status, the effect on cash flow, distributions and the loan, and the next update's date; in a joint venture the capital partner gets it directly, and in a fund add any material-loss report the fund agreement requires. Rule 10b-5 forbids a material misstatement, or an omission that makes what is said misleading, when a security is bought or sold; where interests change hands or capital is sought, counsel reviews the update. A person approves each notice before it goes.

    Why an agent can do it

    Drafting from the lease terms and the forecast is writing work; nothing goes out without a person's approval.
    Risk
    High
    Undo
    Irreversible
    Approval
    Approved each run
    Waits on
    Step 05
    Uses
    Lease abstract, Rent roll, Investor register, Underwriting model
    Proof to keep
    Rent roll

    Software for this step, scored in Investor portals and fund administration

    1. Covercy19 of 100
    2. Agora17 of 100
    3. Cash Flow Portal16 of 100
    4. AppFolio Investment Manager14 of 100
  7. Step 7:Meet the adjuster and get independent repair estimates

    Person offline· principalHard to undoHigh risk
    Details of step 7, 5 sources

    A principal or the property manager walks each adjuster through the damage with the inventory and photos, and gets contractor estimates, and an engineer's report where structure, roof or systems are in doubt, for the insurer. A Texas prompt-payment insurer accepts or rejects in writing within 15 business days of receiving everything it requested, or says why it needs longer and decides within 45 days of saying so, then pays within 5 business days, or 20 if surplus lines; each deadline runs 15 days longer after a weather-related catastrophe or major natural disaster the commissioner defines. TWIA decides within 60 days of the later of the claim or the information it requested. A public adjuster needs a Texas license and a state-approved contract the firm may cancel in writing within 72 hours of signing, takes at most 10 percent of the settlement and may not do the repairs.

    Why a person does it

    Walking the property with the adjuster and the contractors is done in person; an agent tracks the requests and the dates.
    Risk
    High
    Undo
    Hard to undo
    Approval
    None
    Waits on
    Steps 03, 04
    Uses
    Property condition assessment, Property insurance binder
  8. Step 8:Check whether rebuilding must meet current flood and building rules

    Agent in a browser
    Details of step 8, 7 sources

    Look up the flood zone on FEMA's Flood Map Service Center, and draft a principal's question to the floodplain official: will the community find the building substantially damaged, meaning repairs cost at least half its pre-damage market value? In a special flood hazard area it must then meet elevation or floodproofing standards. A federal flood policy with building coverage pays up to $30,000 of that work if the community, enforcing its floodplain rules, finds the building substantially or repeatedly flood-damaged and the work is done within two years; it otherwise excludes code costs. Under TWIA cover, permanent repairs must meet its building code, with prior notice to the Department of Insurance and an engineer-backed certificate of compliance, to keep the building insurable; temporary storm repairs need no inspection. List from the zoning report other permits, code upgrades or zoning limits changing cost or time, against ordinance or law coverage.

    Why an agent can do it

    The flood map and the federal rules are public; the conversation with the local official is a principal's.
    Risk
    Medium
    Undo
    Reversible
    Approval
    Standing approval
    Waits on
    Step 03
    Uses
    Zoning report, Survey, Property insurance binder
  9. Step 9:Re-test cash flow and loan coverage with rent abated

    Agent
    Details of step 9, 2 sources

    Rebuild the operating forecast month by month through the restoration: the rent each lease abates, tenants that may terminate, rent loss or business income cover with its waiting period and limit, deductibles and costs paid before insurance pays, and what the leases let the firm recover. A federal flood policy pays only direct physical loss and excludes lost revenue, so rent a lease abates after a flood is uninsured unless a rent loss policy covers flood; for a commercial or five-plus-unit building it also settles at actual cash value, leaving depreciation unpaid. In Texas, an insurer may withhold recoverable depreciation until it sees proof the deductible was paid. Run the income-value and leverage calculators for coverage and debt yield as the loan defines them, and mark each month's cash gap and what could fund it. If a covenant fails, open loan-covenant-breach; if a planned distribution cannot be paid, open distribution-shortfall.

    Multifamily

    Count each unit out of service, and each resident who ends a lease after the casualty, as lost rent until the unit is restored and re-leased.

    Retail

    Add lost percentage rent and any co-tenancy rent reductions the damage triggers in other leases.

    Why an agent can do it

    The forecast follows from the leases, the policies and the loan terms run through live calculators.
    Risk
    Medium
    Undo
    Reversible
    Approval
    None
    Waits on
    Steps 04, 05
    Uses
    Rent roll, Lease abstract, Trailing-12 operating statement, Loan documents, Underwriting model
    Proof to keep
    Underwriting model

    Software for this step, scored in Deal pipeline and underwriting

    1. Archer37 of 100
    2. Microsoft Excel (with a general AI assistant)28 of 100
    3. Cactus22 of 100
    4. Clik.ai12 of 100
  10. Step 10:Calendar the claim, lease, loan and tax deadlines

    AgentHigh risk
    Details of step 10, 6 sources

    Calendar every date with source and owner: each policy's claim, appraisal and suit deadlines, insurer response dates, and the leases' and loan's notice, restoration and termination dates. Federal flood suits are due within one year of a written denial. TWIA notices state its dates: from a coverage notice, 60 days to demand appraisal (missing it waives the dispute) and 545 days to document repairs for replacement cost; from a denial notice, two years to give notice of suit and sue. Texas requires written notice at least 61 days before suing another insurer over damage from natural forces; counsel times each notice. If the governor declares a disaster area and a building, or rendered income-producing personal property, is at least 15 percent damaged as the chief appraiser determines, prepare Form 50-312 for a principal to file with the appraisal district within 105 days of the declaration, extendable for good cause.

    Why an agent can do it

    The dates follow from the policies, leases, loan documents and statutes; a person signs anything filed.
    Risk
    High
    Undo
    Reversible
    Approval
    None
    Waits on
    Steps 04, 05
    Uses
    Property insurance binder, Lease abstract, Loan documents
  11. Step 11:Sign each proof of loss and send any appraisal demand before its deadline

    Person online· principalSignatureIrreversibleHigh risk
    Details of step 11, 3 sources

    A principal signs each proof of loss by its calendared date, after checking every figure against the inventory and the repair estimates, without waiting for the decision whether to restore. The federal flood proof of loss is due within 60 days of the loss, signed and sworn, and states the insured's own judgment of the amount, even if the adjuster helped prepare it; if the insurer rejects it, an amended proof may be filed within the same 60 days, and the claim is payable 60 days after the insurer receives the proof and the amount is settled. Where the firm disputes the amount a TWIA claim was accepted for, counsel sends the appraisal demand within 60 days of the coverage notice, since missing it waives the dispute. Any other policy's appraisal clause and any presuit notice follow the policy and counsel's timing.

    Why a person does it

    A sworn proof of loss and an appraisal demand bind the firm and rest on a principal's own judgment of the amount.
    Signs
    Sign each proof of loss and send any appraisal demand before its deadline
    Drawn by
    Principal
    Approved by
    Principal signs. Not signed yet.
    Risk
    High
    Undo
    Irreversible
    Approval
    Signature
    Waits on
    Steps 07, 10
    Uses
    Property insurance binder
  12. Step 12:For a JV, get the capital partner's consent to the restoration plan and settlement

    Person online· investorHard to undoHigh riskJV only
    Details of step 12, common practice

    Send the capital partner the loss inventory, the adjuster's and contractors' estimates, the rebuild rules found, the cash forecast, and the proposed restoration plan and claim settlement. Settling a large claim, deciding whether to restore, ending leases, funding a cash gap and changing the loan are usually major decisions a JV agreement reserves for the capital partner; get its written consent before any of them is signed, and confirm how any added capital is credited and whether the change affects the promote.

    Why a person does it

    The partner's consent is its own decision under the JV agreement.
    Risk
    High
    Undo
    Hard to undo
    Approval
    None
    Waits on
    Steps 07, 08, 09
    Uses
    Joint venture agreement, Underwriting model

    Source

    Common practice, with no public source to cite.

  13. Step 1213:Decide whether to restore, and sign the claim settlement

    Person online· principalSignatureIrreversibleHigh risk
    Details of step 1213, 3 sources

    The principals decide, with the lender where the loan gives it a say and the investors where the deal entity agreement reserves the decision to their vote: restore as before, restore differently, or, only where the leases and loan allow, not restore; and whether to accept each insurer's final adjustment. Send any landlord termination notice the leases or Property Code 92.054 allow only after this decision and any JV consent, within the period calendared. Before signing a lease termination, release or settlement with anyone who may have caused the loss, confirm with each insurer that it does not give up the insurer's recovery rights. Counsel handles any presuit notice or suit. Endorse each proceeds check, which may also name the lender, and deposit it as the loan directs; the restoration follows run-a-capital-project.

    Multifamily

    Under Texas Property Code section 92.054, a landlord ending a lease because a casualty left the unit totally unusable gives written notice before repairs are finished; keep a copy. A landlord that decides to demolish a unit or stop renting it as housing closes it by certified-mail notice, return receipt requested, to the resident and to the local health officer and building inspector, if any; the unit may not be reoccupied for six months after the resident moves out, and if the resident had given a repair notice the landlord pays reasonable moving expenses and a pro rata rent refund (section 92.055).

    Why a person does it

    Choosing whether to rebuild and signing a settlement or release bind the firm.
    Signs
    Decide whether to restore, and sign the claim settlement
    Drawn by
    Agent
    Approved by
    Principal signs. Not signed yet.
    Risk
    High
    Undo
    Irreversible
    Approval
    Signature
    Waits on
    Steps 08, 09, 11Steps 11, 12
    Uses
    Loan documents, Lease abstract, Underwriting model, Deal or fund entity agreement, Property insurance binder
  14. Step 1314:Record the claim, payments and repairs, and give the CPA the tax facts

    Agent
    Details of step 1314, 4 sources

    Keep one claim file per policy: notices and acknowledgments, adjuster reports, estimates, each proof of loss, each payment and whether the lender held or released it, proof the deductible was paid, mitigation and repair invoices with their lien waivers, and any certificate of mold remediation, which goes to a buyer in any sale within five years of its issue. Update the rent roll for any lease termination and the underwriting model, and hand the rebuild to run-a-capital-project and the loss history to renew-property-insurance. For the CPA: proceeds above the property's adjusted basis are gain that may be deferred by buying similar replacement property within the set period, generally two years after the close of the first tax year in which gain is realized, and after a federally declared disaster any tangible business property counts as similar; when a partnership owns the property, only the partnership can elect.

    Why an agent can do it

    Filing the claim records and updating the rent roll and model is record work; the tax election is the CPA's call.
    Risk
    Medium
    Undo
    Reversible
    Approval
    None
    Waits on
    Step 12Step 13
    Uses
    Property insurance binder
    Proof to keep
    Rent roll, Underwriting model

Order of work: what waits on what.

Read down, stage by stage

  1. Stage 1

  2. Stage 2

  3. Stage 3

  4. Stage 4

    • Stage 5

      • Stage 6

        View
        Syndication and fundJV
        Steps
        1314
        Longest chain
        6 steps: 01, 03, 07, 11, 12, 13The first of 3 this long6 steps: 01, 03, 07, 11, 13, 14The first of 7 this long
        Side by side
        4 at most
        • Agent
        • Agent in a browser
        • Person online
        • Person offline
        • A person’s step has a cut corner
        • Signature
        • Irreversible
        • Hard to undo
        • On the longest chain

        Steps in one stage do not wait on each other.

        What the steps ask of a person.

        Counted from the step data

        Three steps need a signature. Four steps are irreversible and two are hard to undo. The work passes between your agent and a person five times. The agent stops first at step 01, Get everyone out safely and call emergency services.

        Three steps need a signature. Four steps are irreversible and three are hard to undo. The work passes between your agent and a person five times. The agent stops first at step 01, Get everyone out safely and call emergency services.

        Where the structures differ

        • The JV structure adds one person step: For a JV, get the capital partner's consent to the restoration plan and settlement.

        The rules this situation relies on.

        4 rule cards, each linked to its law

        • Rule 10b-5: no fraud or misleading statements when selling securities

          Federal · Used by step 06
          Rule us-fed.exchange-act.rule-10b-5

          In connection with the purchase or sale of any security, Rule 10b-5 makes it unlawful to use any scheme to defraud, to make an untrue statement of a material fact, to omit a material fact needed to keep the statements made from being misleading, or to engage in any practice that operates as a fraud. It reaches exempt private offerings as well as registered ones, and the issuer answers for statements made on its behalf, oral or written.

          17 CFR 240.10b-5Sources checked AI-drafted

        • Texas mechanic's liens on commercial property: the affidavit deadline

          Texas · Used by step 02
          Rule us-tx.property.mechanics-liens

          On a project other than residential construction, an original contractor claiming a mechanic's lien files its affidavit with the county clerk by the 15th day of the fourth month after the month its work was completed, terminated or abandoned. Other claimants file by the 15th day of the fourth month after the month they last furnished labor or materials; retainage claims follow a separate deadline. A lien's inception is generally the start of visible construction or delivery of materials; a lien for design, survey, landscaping or demolition work begins when its affidavit is recorded and is not enforceable against a grantee or purchaser who acquired an interest before then.

          Tex. Prop. Code 53.003(e) (as amended by S.B. 929, effective May 21, 2025), 53.021, 53.052 (as amended by H.B. 2237, effective January 1, 2022) and 53.124 (as amended by S.B. 929, effective May 21, 2025)Sources checked AI-drafted

        • Texas liability for untrue statements and omissions when selling securities

          Texas · Used by step 06
          Rule us-tx.securities.offer-sale-liability

          Whoever offers or sells a security by an untrue statement of material fact, or omission making its statements misleading, is liable to the buyer, exempt or not, for rescission, or damages if the buyer no longer owns it. Defenses (seller's burden): the buyer knew, or the seller did not and with reasonable care could not have known; an issuer loses the second for writings it prepared and delivered in selling. Whoever controls the seller or issuer, even indirectly, is jointly and severally liable unless it proves that lack of knowledge, as is anyone materially aiding with intent to deceive or defraud or reckless disregard for the truth or the law.

          Tex. Gov't Code 4008.052 and 4008.055Sources checked AI-drafted

        • Texas appraises property at market value as of January 1

          Texas · Used by step 10
          Rule us-tx.tax.market-value

          Except as Tax Code chapter 23 provides, all taxable property is appraised at market value as of January 1: the cash-equivalent price it would bring under prevailing conditions after reasonable exposure on the open market, with buyer and seller informed of its uses and restrictions, both seeking to maximize gain, and neither able to exploit the other's urgent needs. The chief appraiser considers cost, income and market data comparison methods and must weigh all available evidence specific to the property.

          Tex. Tax Code 23.01(a)-(b), 23.0101 and 1.04(7)Sources checked AI-drafted

        Where every fact comes from.

        26 sources, each opened on the date shown

        1. 44 CFR part 61, Standard Flood Insurance Policy: Appendix A(2), General Property Form (I.A, III.D, V.A, V.D, VII.G, VII.J, VII.M, VII.N, VII.O, VII.P and VII.R), and Appendix A(1), Dwelling Form (I.A)
          Office of the Federal Register (eCFR). Opened . Primary source.Quote
          Within 60 days after the loss, send us a proof of loss, which is your statement of the amount you are claiming under the policy
        2. 44 CFR 59.1, Definitions (substantial damage and substantial improvement)
          Office of the Federal Register (eCFR). Opened . Primary source.Quote
          the cost of restoring the structure to its before damaged condition would equal or exceed 50 percent of the market value of the structure
        3. 44 CFR 60.3, Flood plain management criteria for flood-prone areas

          Office of the Federal Register (eCFR). Opened . Primary source.

        4. FEMA Flood Map Service Center (search by address)

          Federal Emergency Management Agency. Opened . Primary source.

        5. What is Increased Cost of Compliance (ICC) Coverage?
          FEMA National Flood Insurance Program (FloodSmart for agents). Opened . Primary source.Quote
          Their building is determined by the community building official to be substantially or repeatedly damaged by floods
        6. 40 CFR 61.145, Standard for demolition and renovation (asbestos)
          Office of the Federal Register (eCFR). Opened . Primary source.Quote
          thoroughly inspect the affected facility or part of the facility where the demolition or renovation operation will occur for the presence of asbestos
        20 more sources
        1. Overview of the Asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP)
          U.S. Environmental Protection Agency. Opened . Primary source.Quote
          notify the appropriate delegated entity (often a state agency) before any demolition
        2. Texas Occupations Code, Chapter 1954, Asbestos health protection (Sections 1954.002 and 1954.101)
          Texas Legislature. Opened . Primary source.Quote
          perform an asbestos survey or inspection of a public building, including the sampling and assessment of exposure
        3. Texas Property Code, Chapter 92 (Section 92.054, Casualty loss; Section 92.055, Closing the rental premises)
          Texas Legislature. Opened . Primary source.Quote
          either the landlord or the tenant may terminate the lease by giving written notice to the other any time before repairs are completed
        4. Texas Property Code, Chapter 93, Commercial tenancies (Sections 93.001 to 93.013)

          Texas Legislature. Opened . Primary source.

        5. Texas Insurance Code, Chapter 542, Subchapter B, Prompt payment of claims (Sections 542.051 to 542.061)
          Texas Legislature. Opened . Primary source.Quote
          notify a claimant in writing of the acceptance or rejection of a claim not later than the 15th business day
        6. Texas Insurance Code, Chapter 542A, Certain consumer actions related to claims for property damage (Sections 542A.001 to 542A.004)
          Texas Legislature. Opened . Primary source.Quote
          the claimant must give written notice to the person in accordance with this section as a prerequisite to filing the action
        7. Texas Insurance Code, Chapter 2210, Texas Windstorm Insurance Association (Sections 2210.205, 2210.251, 2210.2515, 2210.573, 2210.5731, 2210.574, 2210.5741, 2210.575 and 2210.577)
          Texas Legislature. Opened . Primary source.Quote
          an insured must file a claim under an association policy not later than the first anniversary of the date on which the damage to property
        8. Claims process: reporting a claim, claims deadlines, temporary repairs and contractor estimates
          Texas Windstorm Insurance Association. Opened .Quote
          Do not make any permanent repairs until you discuss your claim with a TWIA claims examiner.
        9. 28 Tex. Admin. Code 5.4605, Items not requiring an inspection for windstorm and hail insurance coverage through the Texas Windstorm Insurance Association
          Legal Information Institute (Texas Department of Insurance rule text). Opened . Primary source.Quote
          temporary repairs after a storm
        10. Texas Insurance Code, Chapter 4102, Public insurance adjusters (Sections 4102.051, 4102.103, 4102.104, 4102.158 and 4102.163)
          Texas Legislature. Opened . Primary source.Quote
          The total commission received may not exceed 10 percent of the amount of the insurance settlement on the claim.
        11. Public adjusters: What to know before you hire one to help with your claim
          Texas Department of Insurance. Opened . Primary source.Quote
          Under Texas law, public insurance adjusters who work on your claim can’t act as your contractor.
        12. Texas Business and Commerce Code, Chapter 27 (Section 27.02, Goods or services paid for by insurance proceeds: payment of deductible required)
          Texas Legislature. Opened . Primary source.Quote
          Texas law requires a person insured under a property insurance policy to pay any deductible applicable to a claim made under the policy.
        13. Texas Insurance Code, Chapter 707, Payment of insurance deductible (Sections 707.001, 707.002 and 707.004)
          Texas Legislature. Opened . Primary source.Quote
          until the insurer receives reasonable proof of payment by the policyholder of any deductible applicable to the claim
        14. Texas Occupations Code, Chapter 1958, Mold assessors and remediators (Sections 1958.101, 1958.102, 1958.154 and 1958.155)
          Texas Legislature. Opened . Primary source.Quote
          A license holder may not perform both mold assessment and mold remediation on the same project.
        15. Texas Tax Code, Chapter 11 (Section 11.35, Temporary exemption for qualified property damaged by disaster; Section 11.43(s), application deadline)
          Texas Legislature. Opened . Primary source.Quote
          not later than the 105th day after the date the governor declares the area
        16. Form 50-312, Temporary Exemption Property Damaged by Disaster
          Texas Comptroller of Public Accounts. Opened . Primary source.Quote
          File this form and all supporting documentation with the appraisal district office in each county where property is located
        17. 17 CFR 240.10b-5, Employment of manipulative and deceptive devices
          Office of the Federal Register (eCFR). Opened . Primary source.Quote
          To make any untrue statement of a material fact or to omit to state a material fact necessary in order to make the statements made
        18. 26 U.S.C. 1033, Involuntary conversions (subsections (a)(2) and (h)(2))
          Legal Information Institute (statute text). Opened . Primary source.Quote
          2 years after the close of the first taxable year in which any part of the gain upon the conversion is realized
        19. Publication 547 (2025), Casualties, Disasters, and Thefts
          Internal Revenue Service. Opened . Primary source.Quote
          If a partnership or a corporation owns the stolen or destroyed property, only the partnership or corporation can choose to postpone reporting the gain.

        What it needs, and what it hands on.

        What it needs

        UsesProperty insurance binder, Loan documents, Lease, Lease abstract, Rent roll, Trailing-12 operating statement, Property condition assessment, Zoning report, Survey, Underwriting model, Investor register, Deal or fund entity agreement, Joint venture agreement

        What comes next

        No record lists this one as its prerequisite yet.

        ProducesRent roll, Underwriting model

        Where the catalog stands

        96 written in full: 72 playbooks, 22 scenarios and 2 audits. An agent can do 64% of the 1169 written steps.

        Federal + Texas · Counted